Common Questionnaires for IE Manager/Asst. Manager

 

Common Questionnaires for IE Manager/Asst. Manager

Full Marks: 100

Time: 01 Hour                                                                                      Date:

Name of Applicant:

 

Educational Qualification:                                                                     Contact No:

1.       Why IE needs in garments sectors?                                                                                2

2.       What are the main objectives to IE activities in any manufacturing industry?                   2

3.       What is SMV? Write down the equation of SMV?                                                          4

4.       What is Motion Study? Write down the economic principle of motion study.                   4

5.       Write down the 5 parameters which hampered sewing production?                                  2.5

6.       Draw the Break-even Curve & indicate the break-even point & other related terms.          2.5

7.       Draw the Demand & Supply Curve & indicate its different points.                                   3

8.       What is JIT? What things are related to JIT?                                                                  3

9.       What is PMTS? What is Logistics & Bonded ware house?                                              3

10.    Draw the Product life Cycle & mention every stage.                                                       4

11.    What is the difference between Ergonomics & Human Factor Engineering?                     5

12.   What is Lean Manufacturing? What is Kanban, Kaizen, 7 Wastes, 5S, 5M?                     12

13.   Write Full meaning of below abbreviation…                                                                  10

a.       CPM

b.       BOM

c.       IRR

d.       MRP2

e.       PERT

f.        PLC

g.       SOP

h.       GSM

i.        ISO

j.        TQM

14.    What is the relation between IE & Planning? Write linkup points.                                   3

15.   What is Overhead Cost & Fixed Cost? Write in short.                                                     3

16.   Write the types of Cause-Effect Analysis.                                                                      3

17.    What is Forecasting? What types of forecasting used in garment industry? Write in short. 4

18.   What is Lead Time? Write lead time distribution chart.                                                   4

19.    Write the planning hampered points.                                                                              3

20.    What is CM? Write the equation of CM in IE view.                                                        4

21.   What is Running Capital? Write down the running capital blocking points in garments industry? What types of planning is used to reduce running capital blocking tendency?    6

22.   Suppose you are giving layout for a style which SMV is 6.5 & Target 2000pcs,

 allocated 20 Operators & 5 Helpers, Final Output is 1800pcs by 10 hours.                     

a.       What is Line Efficiency?                                                                                         2

b.       Find out Balancing Loss?                                                                                        2

23.   What is Method Study? Write down 7 points of method study.                                        3

24.    What is meaning of NPT? Write 5 points of NPT.                                                          3

25.    What is rating?  Write down the equation of basic time.                                                  3

Comments

Popular Post 📯

🧮 SMV Calculator